01514nam a2200349 k 4500001001500000005001500015008004100030035002000071040001300091049002100104052002200125086002100147090002600168100004800194245011700242260017500359300002500534440004000559490004000599500001700639500005500656500002000711504004900731536000900780650004200789700004500831700003300876710007200909710006100981830007901042963004301121WMF000050890 20201127100733881222d198810 us a bt 000 eng  a(DGPO)94076142  dGPOdDLC0 lZZ0000089680fXA06aD 103.53bP-89/01 aD 103.53:P-89/01 aTH223b.C5 TR P-89/011 a황규승,g黃圭承,d1946-0KAC20163127710aFacility cost simulation models:ba basis for replacement policy/dby Kyu-Seung Whang, Alan Moore, Gonzalo Perez aChampaign, Ill.:bUS Army Corps of Engineers, Construction Engineering Research Laboratory;a[Springfield, VA:bNational Technical Information Center, distributor,c1988] a99 p.:bill.;c28 cm00aUSA-CERL technical report;vP-89/0110aUSA-CERL technical report;vP-89/01 aCover title. aDistributed to depository libraries in microfiche. a"October 1988." aIncludes bibliographical references (p. 41). aOCE. 0aBuildingsxRepair and reconstruction.1 aMoore, Alan Wesley,d1944-0KAC2020S38951 aPerez, Gonzalo0KAC2020M5599 aConstruction Engineering Research Laboratory (미국)0KAB202010716 aUnited States.bArmy.bOffice of the Chief of Engineers. 0aTechnical report (Construction Engineering Research Laboratory);vP-89/01. aBuildingsaRepairaandareconstruction